Component
École Nationale Supérieure d'Électrotechnique d'Électronique
Objectives
Implement an optimized decision-making system based on Petri nets for a flexible workshop.
Description
Ensure compliance with a production sequence for different objects that must pass through stations dedicated to different operations, using a circuit and a shuttle for transportation.
Ensure that several objects are produced at the same time (Work In Progress >1).
Using a Petri net, propose a solution for managing several shuttles to optimize the production cycle.
Pre-requisites
Petri net, Discrete Event Systems
